C&P has been recognized as a “Recognised Inspection Body under Regulation 25(2) of the Health and Safety in Employment (Pressure Equipment, Cranes, and Passenger Ropeways) Regulations 1999 (PECPR Regulations)” by WorkSafe New Zealand and is therefore able to provide you the support you need to export your pressure equipment to New Zealand.
Read more ...
Each manufacturer shall, before manufacturing equipment designed in an overseas country, as far as reasonably practicable ensure that the design and design verification have been carried out in accordance with standards equivalent to those imposed by Regulation 18 for designs and design verification carried out in New Zealand.
Regulation 18 specifies:
Tasks related to design and design verification.
Each designer shall, as far as reasonably practicable, do the following in accordance with the standards of generally accepted design practice:
- design equipment in such a way that it is safe when used for its intended purpose;
- determine and specify in the project, its level of risk;
- determine and specify at the design stage the expected lifespan of the equipment;
- determine and specify in the design, design verification requirements, manufacturing requirements, and manufacturing inspection requirements;
- take into account the nature of New Zealand’s seismic environment in design and verification requirements.
How to...
To obtain the Pressure Equipment Inspection Certificate, it is necessary to submit a request for quotation/intervention form AM042N, in which it is specified that the inspection certificate is required in accordance with the construction standards specified for export to New Zealand, submit the construction drawings, the stability calculations, the welding book consisting of welding procedures, qualifications.